News

The Minister of Housing follows up the executive position of the various projects being implemented in the new city of El Alamein

عاصم الجزار

Assem El Gazzar

Aya Hussain

Dr. Assem El-Gazzar, Minister of Housing, Utilities and Urban Communities, continued the executive position of the various projects being implemented in the new city of El Alamein, including the beach towers, the Down Town towers, the recreational area, and the Down buildings. Town, the heritage city, and others.
4096 The Minister of Housing explained, It is underway to finish finishing the facades for A tower that has been completed in the beach area, and the interior finishing works of these towers are being carried out in parallel, and a number of other towers are being implemented in the beach area, and the work has been completed in the entertainment area, which is in the middle of the beach towers area, overlooking the sea directly, and includes A garage with a capacity of 3 thousand cars, and a number of shops, in addition to the completion of the finishing works of the beach part m The tourist walkway, which is 7 km long, and a walkway is being implemented on the lake in the area behind the residential towers.
4096 The minister indicated that the Down Town Towers project is also underway in the new city of El Alamein, which is being implemented by the Chinese “cscec” company, similar to the towers of the central business district in the New Administrative Capital, with self-financing from the Urban Communities Authority. New, where the project includes the construction of 5 fully finished residential towers and services, and the towers overlook an artificial lake, and includes the iconic tower with a height of 128 meters (68 dora) With a total surface area of ​​404 thousand square meters, and it is scheduled to be implemented within 45 months, and 4 towers as high as meters to the tower ( (dora) in total areas 250 thousand square meters, and it is scheduled to be implemented within 35 months.

And Dr. Asim Al-Jazzar added that the Down Town area includes 39 A building with 896 units, with the specifications of finishing the housing above the distinguished, and with a variety of areas, and it was delivered A number of units for its barriers, and 24 is being implemented A building in the second phase of the Downtown buildings, with 896 housing units, and the completion rate reached 63 %, while the concrete works have been completed, and the finishing works are being carried out in the Latin Quarter and the Maqam On an area of ​​404 acres, it consists of 6 areas that include residential units, distinct service areas, parking spaces and a group From the gardens.
4096 The Minister of Housing said: It is also underway in the city of El Alamein New implementation of the heritage city project, on an area of ​​250 acres, and the total number of establishments in the city is about 70 facility, which includes (the main lake – the central garden – the mosque – the church – the Roman theater – the opera – commercial and hotel buildings in the old quarter – the cinema complex), and some facilities are being completed in them, and the “Mazarine” compound is being implemented, with an area of ​​​​700 acres, and includes about 10 thousand housing units (buildings – villas – chalets).
4096 The minister pointed out that a number of university colleges have been operated Al Alamein International Science and Technology, which is built on an area of ​​70 acres, and includes (the administration building – College of Graduate Studies – Central Library – College of Human Medicine – College of Oral and Dental Medicine – College of Pharmacy – College of Art and Design – College of International Legal Studies – College of Business Administration – College of Engineering 1 – College of Computing and Information Technology – College of Engineering 2 – College of Tourism and Hospitality – University housing (students), faculty and researchers housing – university housing (female students) and faculty and female researchers housing – university hospital – service building – multi-purpose sports hall – oral and dental hospital)
4096 Dr. Asim Al-Jazzar indicated that the implementation of 45 Residential Building ( (a housing unit) in the first phase of the distinguished housing, while is being implemented Another building in the second phase of the project, with 404 A residential unit, and 4096 a residential unit (4096 is being implemented (Residential Building) in the “Egypt Housing” project for medium housing, and the percentage of its completion has reached 68 %, in addition to the implementation of various utility projects and networks, and road works.